St. Martin of Tours

Coordination of the delivery, unloading and installation of these massive members was like fitting a piece in a puzzle.

This project consisted of 71 tons of structural steel and 57 tons of joist & girders including two main girders 10ft deep, 109ft long and shipped in one piece. Coordination of the delivery, unloading and installation of these massive members was like fitting a piece in a puzzle. The center rafter frames were fabricated so that a cross was visible at each peak.

This project was on a fast track and had to be on schedule for a highly publicized grand opening. Intricate details and ever changing sequencing did not keep us from having the steel fit perfectly and meeting all of the deadlines.

©2012 Germantown Iron & Steel Corp.
262-677-2530